the ryedale plan

Consultation on the Preliminary Draft Charging Schedule (PDCS) closed on 15 November 2013. An electronic version of the PDCS consultation document and the Economic Viability Assessment is available below. A link to the Council's Infrastructure Delivery Plan is also available below.

Attachments (downloads):
FileDescriptionNo of pagesFile sizeCreated
Download this file (Ryedale_CIL_Final Report.pdf)CIL Economic Viability Assessment Aug 2013 671651 kB03-2014
Download this file (PDCS_Consultation_doc.pdf)PDCS consultation document Sept 2013 14292 kB03-2014